Lock Out Tag Out Procedure Example
It documents the scope of work permitted under the loto.
Lock out tag out procedure example. A sample lockout tagout policy for your workplace contents. The lock physically holds the switch or handle in the off position until it is removed by the authorized personnel. A loto procedure is required for all complex lotos. The procedure outlined in this article establishes the minimum requirements for the lockout or tagout of energy isolating devices.
The lock shall have the individual workers name and other identification on it. A sample lockout tagout procedure a good lockout tagout procedure at a minimum should contain the following elements. A loto procedure is a formal document detailing all the steps required to establish the lockout. It shall be used to ensure that the fixture equipment or machinery is.
A list of procedures abbreviated as loto designed and. Lockout is the preferred method of isolating fixtures equipment or machinery from energy sources. A system in which a lock when properly attached to a power or energy source prevents the unintentional activation of equipment. Osha estimates that complying with loto standards helps prevent 120 fatalities and 50 000 injuries each year.
Following osha lock out tag out procedure standards by using a procedures template and safety checklist will help ensure that all dangerous machinery and equipment are properly shut off locked out and tagged before performing maintenance checks. The authorized employee shall know the type and magnitude of energy that the machine or equipment utilizes and shall understand the hazards thereof. Employees who work in areas where lockout tagout procedures are used must understand the purpose of the procedures and are prohibited from attempting to restart machines or equipment that are locked or tagged out. The loto procedure fulfills the following purposes.
5 2 sequence of lockout or tagout system procedure notify affected employees that a lock out or tag out system is going to be utilized and the reason. This may determine any number of items such as the turning off the power at a breaker or shutting a valve. All maintenance personnel shall be provided with a good lock. Each worker shall have the only key to the lock.
It is specific both to the equipment or system and to the scope of work. The next step of the lockout tagout process or procedure is to isolate the machine and or the equipment from any source of energy. Pub 3000 chapter 18 work process n addresses loto procedures. Lock out tag out procedures are to be completed before any service or maintenance work on equipment or machinery and or before entry into any grain bin or other area where operating equipment poses a hazard to the entrant.